Scheme 04: Wotton Brook

Riparian restoration plus associated habitats

Located within Hucclecote and Barnwood Wards

There are several locations of works proposed covering Barnwood Park, Appleton Way, Porchester Road, Clock Tower and Saintbridge Dry Basin. The intended works at these locations are as follows: -

At Barnwood Park we intend to create wetland areas within the balancing pond.  The wider area will be subject to meadow creation and planting which will be maintained accordingly.

In the existing balancing pond at Appleton Way we plan to have wetland area scrapes with the location benefiting from wildflower meadow creation and tree planting.  Improvements to access are planned to allow maintenance vehicles access and egress.

A new drainage strategy is to be created along a small section of Porchester Road. This will divert road run-off into a swale before discharging into the Wotton Brook. This will improve water quality and reduce flood risk. The local green space will be cultivated for wildflower meadow creation with a mown path for pedestrian access.

Clock Tower balancing pond and surrounding area is proposed to be partially cleared to allow for wildflower meadow and native tree planting.

At Saintbridge dry basin we are creating a wildflower meadow to provide for pollinators and create a link with the River Twyver and Sud Brook.

Updates

June 2023

Works across all these sites are now complete and are being managed accordingly.

Boardwalks at Appleton Way and Barnwood Park are now installed with planting and meadow creation at Clock Tower complete. Clock Tower has been planted with lots of daffodils throughout with the help of the local community group GreenAbbey.

Boardwalk at Barnwood Park

Wetland scrapes at Appleton Way

Highway drainage swale at Porchester Road

The ponds at Appleton Way have had on occasions been covered with pond weed.  We are monitoring the situation with the local Countryside Rangers and volunteers helping.  As the pond establishes and reaches equilibrium the flora and fauna will to some extent control the pond weed naturally.

October 2021

Works across these sites are now entering their last stages.  Meadow planting at Saintbridge Dry BasinBarnwood Park and Appleton Way is now complete. Changes at Barnwood Park can be seen from the initial cultivation (JPG, 1.9 MB) to the first bloom (JPG, 1.9 MB)

This year at Saintbridge there was a stunning display of cornfield annual flowers (JPG, 3.6 MB) including poppies, 

corncockles and cornflowers. These acted as a ‘nurse crop’, protecting the slower to establish, more subtle, perennial wildflowers. Over time, the perennial wildflowers should become increasingly diverse with species such as ox eye daisy, hawkbit and wild carrot, providing essential habitat for pollinators and other wildlife.

Any trees planted during last year that have died will be replaced this winter.

The proposed boardwalks at Appleton Way and Barnwood Park public open spaces will be installed by the end of November this year.

Clock Tower is currently being cultivated in preparation for wildflower seeding and a large number of bulbs will be planted, to provide colour in spring (planting plan (PDF, 358 KB)). We have also been in contact with the local Friends of Park group at Clock Tower (GreenAbbey) with plans to provide them and their volunteers with over 1000 native daffodil bulbs to plant. Native daffodils provide a useful early season source of nectar for pollinating insects.

In order to allow the wildflower seed to make contact with the earth and germinate it has been necessary to cultivate the soil and create bare ground. The bare soil may persist for a number of months, but will gradually ‘green-up’ as the seeds begin to germinate.

The future maintenance of the wildflower meadows will involve carrying out a late summer cut (hay-cut) once most flowers have bloomed.  Additional tidy cuts may be carried out late autumn and spring.  Arisings will continue to be deposited in discrete locations and will provide useful habitat for slow worms and invertebrates.

October 2020

Unfortunately the weather during August was not in our favour which resulted in the ground becoming too sodden and hampering the proposed groundworks across all sites.  This has led to programme slippage and ultimately in several locations missing the wildflower seed planting window.

The programme slippage has meant that Porchester Road scheme and the seeding of Appleton Way basin has been deferred to next year.

Seeding has been successfully carried out at Barnwood ParkClock TowerSaintbridge dry basin and the M5 corridor.  The process of creating bare earth for the wildflower seed to germinate may leave the sites looking a little worse for wear until the meadow is established.

Following the wildflower seeding a specific maintenance regime is to be followed.  This will typically include in the 1st year regular cutting of the site to reduce the competition of the weeds and native grasses (except those areas where Yellow Rattle has been sown).  After this the area will be subject to a cut & collect regime that mimics historic meadow management by grazing.  This will be in the form of a spring cut in April to prepare it for flowering through the summer.  Once the meadow has flowered a main summer cut, referred to as a hay cut, will be carried out between June and August depending on what is flowering.  In some instances we may then carry out an autumn cut in late November to keep weeds and weed grasses at bay to allow the wildflowers to persist the following year.

Mown paths and areas that have not been treated or sown for wildflower meadow will be maintained as previously with regular close mown cuts throughout the year.

August 2020

Wetland habitat scrapes have been formed at Barnwood Park and the wider site is being prepared for wildflower seeding this autumn.

The process of creating bare earth for the wildflower seed to germinate may leave the site looking a little worse for wear until the meadow is established.

Once established the wildflower will be cut twice a year; one late summer cut after flowering and a second cut in autumn.

Landscaping works to create a wildflower meadow are planned to commence soon at Saintbridge Dry Basin.  The following plan indicates the proposed layout:

Short mown paths are to be cut following current desire lines that are intended to continue to allow users to walk around the flood basin.

June 2020

We are pleased to announce that works are able to start at these sites following the on-going Covid-19 restrictions.  Appleton Way and Barnwood Park are scheduled to start this month.  Site notices have been put up and a localised letter drop was carried out to keep residents informed.

Drawings for Appleton Way are presented below.

 

Following comments from the public we have now reduced the coverage of the wildflower meadow in Barnwood Park.  The area under the existing rugby posts will be approximately 60m² of amenity grass.

Porchester Road area is scheduled to mid June.  The aims of the works here are to reduce the risk of flooding by creating swales to aid with the highway drainage and improve the habitat for wildlife and pollinators with the introduction of wildflower meadow, bird boxes and native bulb and tree planting.

The latest drawings for Porchester Road are below.

March 2020

Here are answers to the most common questions asked about the Urban Greening project at Barnwood Park.

Will there be open grass areas?  A large area surrounding the existing rugby posts is to be retained as 'amenity grass' with the overall wildflower meadow cut short twice a year.

Are any paths being kept?  Within the wildflower meadow we will provide several mown paths that replicate the current routes and desire lines observed on site.

Will we be able to bring our dogs?  There are no plans to exclude dogs from the basin site.  The proposal provides a much more interesting, varied and pleasant landscape that will improve everyone's visit, including dogs.

February 2020

In this month we will be carrying out localised tree and vegetation clearance works across the various sites.  The following sketch shows the proposed works for the Barnwood Park site that comprises wildflower meadow and wetland habitat creation.  Two new benches are proposed to allow visitors to take in the dramatic colours of the meadows when they are in full bloom.

Design of the other sites is still underway, drawings will be posted as soon as they become available.

October 2019

Design work for all these sites is currently underway.  When ready, details will be posted on here.